33 Richmond Road, Keswick Terminal is a Growthpoint commercial building in inner-western Adelaide, tenanted by Tetra Tech. A 49.99kW array of 101 solar panels was installed across the sawtooth roof and certified in July 2023, with the building occupied throughout.

The Keswick Terminal roof runs as long metal-deck bays broken up by existing solar hot water collectors, air conditioning units and plant screens. The usable area for a new array had to be worked out around all of it.
101 × 495W solar panels were laid out across the clear runs of decking, tilt-mounted where the pitch called for it and flush-mounted where it did not, with cable runs taken back along the existing service routes.
Work ran from 22 June to 4 July 2023 with the building occupied throughout, and the system was certified under the SA Electricity Act on 5 July 2023.

The array runs back to a single 50kW inverter configured to AS/NZS 4777.2:2020 (Australia A), with all mounting, earthing and DC protection installed to standard and the system tested and labelled at commissioning.
The array was laid out around existing solar hot water collectors, air conditioning units and plant screens already on the roof, with the building occupied throughout.

The system was wired, commissioned, labelled and tested, then certified under the Electricity Act 1996 with no unsafe items or remedial work recorded on the risk assessment.
101 × 495W solar panels across the Keswick Terminal roof.
No unsafe items or items requiring remedy observed at certification.
Inverter set to AS/NZS 4777.2:2020 (Australia A), approved by SA Power Networks
System details on this page are taken from the Electrical Certificate of Compliance for this site, issued 5 July 2023. Equipment counts and specifications reflect the project as installed.
Building usage assessed against available roof area to size an array that generates against daytime load rather than exporting.
Roof surveyed around existing solar hot water collectors, air conditioning units and plant screens before the layout was set.
Array set out across the clear roof bays, with SA Power Networks approval and inverter grid settings arranged ahead of install.
101 panels installed between 22 June and 4 July 2023, with the system commissioned, labelled and tested before certification.
Send us your details and we'll model what your roof can generate and the payback on a system sized to your usage — no cost.




Prefer to talk? Call 1300 996 917
System details on this page are taken from the Electrical Certificate of Compliance for this site, issued 5 July 2023. Equipment counts and specifications reflect the project as installed. Nothing on this page is a guarantee of system performance, financial advice, or an offer. Speak to us for a system designed around your own site.